Time will tell on energy savings--
Only issue is that even with two guys outside trim is not done, so the gaps/insulation show. He will not come back tomorrow and recognized I was not happy and concerned about rain coming in. Said it will not be an issue and if insulation gets wet, he will replace it. This may be normal procedure and no big deal, but was a little disappointed. My wife thought that if they knew good chance of not getting done, maybe should have done half one day and half another. And, completed everything on the windows each day.
Again if this is really no issue, then all went very well. Their problem is I may side house in spring and they seem slow to complete projects IMHO--


One note, the U Factor was 30 on sticker and heat gain? 30 also. I will have to recheck, but thought UV was 28. May be wrong and no time to search tonite--
Ken